Plug & Abandonment Awareness
In this DECOM era, there is a growing need for industry personnel to understand Plug & Abandonment (P&A). At RHAZES, we are keen to work with oil & gas operators and service companies to look at some of the requirement under the PETRONAS Procedures & Guidelines for Upstream Activities (PPGUA) and the basic to plug & abandonment a well.
Stuck Pipe Prevention
It has been known that stuck pipe contributes to among the highest Non-Productive Time (NPT) in any of the drilling operations. Preventing stuck pipe incidents can save thousands of dollars in non-productive time. Stuck Pipe Prevention covers topics to eliminate or greatly reduce stuck pipe incidents on your rig.
Copyright © 2020 Rhazes Well Control Sdn. Bhd. - All Rights Reserved.